STM-01 Typical Storm Precast MH ( Rev. 6-6-23)
| PDF
|
STM-02 Typical Channel Detail for CBs and MHs (Rev. 6-6-23)
| PDF |
STM-03 Typical Poured Invert (Rev. 6-6-23)
| PDF |
STM-05 Wadsworth Catch Basin 1-2 (Rev. 6-6-23)
| PDF |
STM-06 Wadsworth Catch Basin 1-3 (Rev. 6-6-23)
| PDF |
| STM-07 Curb Inlet Precast Manhole (Rev. 7-7-23) | PDF |
STM-09D Drop Curb-Overflow Swale Detail at Sidewalk (Rev. 6-6-23)
| PDF |
STM-09U Drop Curb-Overflow Swale Detail at Sidewalk (Rev. 6-6-23)
| PDF |
| STM-19 Wadsworth Catch Basin 2-2 and 2-3 (Rev. 7-7-23) | PDF |
| STM-21 Wetland Protection Area (Rev. 9-2022) | PDF |
| LAT-01 Typical Storm Lateral Installation (Rev. 7-23-20) | PDF |