Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Right of Way Application

  1. 2018 Engineering 2 color
  2. A permit is required if you are working in the City right of way for any reason. There is a $20 fee for right of way permits (no charge for sidewalk permits). Depending on the type of project, additional fees may apply (see below). All right of way applications will be reviewed prior to permit issuance. Work may not begin until approval is given and permit is issued.
  3. Type of project (check all that apply):*
  4. Location of opening (check all that apply):*
  5. Please attach a detailed plan/drawing of the proposed scope of work. Plans should be to scale and include dimensions, property lines, and underground utilities including sanitary, water and storm mains. If needed, the Engineering Department can supply an aerial view GIS map that can be used to prepare your plan. If you are unable to attach a plan to this form, please mail to City of Wadsworth, Engineering Dept., 120 Maple St., Wadsworth, OH 44281.
  6. Lane closure required:
  7. PARCEL OWNER INFORMATION
  8. CONTRACTOR/AGENT (if applicable)
  9. PROFESSIONAL ENGINEER/SURVEYOR (if applicable) - must be licensed in Ohio
  10. Damage to underground utilities resulting from this excavation shall be the responsibility of the contractor performing the excavation. Before starting any excavation the Contractor MUST contact the Ohio Utilities Protection Service (OUPS) at 8-1-1 or 1-800-362-2764, at least 48 hours but no more than 10 working days before beginning ANY digging project.
  11. For Engineering Department permits:
  12. 1. Failure to obtain inspections during construction may result in penalties and/or removal and reconstruction of improvements.
  13. 2. Work shall not proceed until the inspector has approved the various stages of construction.
  14. 3. Required inspections can be arranged by calling (330) 335-2751 or by visiting the Engineering web page at wadsworthcity.com. Engineering inspections must be requested by 2:00 p.m. one business day before the inspection is needed.
  15. Applicant's statement:
  16. 1. I hereby certify that the owner of record authorizes the proposed work and this application, and I am acting as the agent on their behalf.
  17. 2. I agree to conform to all applicable laws of the City of Wadsworth, all applicable codes and provisions stated in this application.
  18. 3. I hereby certify that all land clearing, construction or development involving the movement of earth shall be in conformance with standard erosion, runoff and sediment control practices to prevent soils from being deposited onto adjacent properties, rights-of-way, public storm drainage systems, wetlands and/or watercourses.
  19. 4. I agree to obtain the required inspections and that no part of the structure/improvements will be used or put into service until after obtaining the final inspections and substantial completion has been approved.
  20. 5. I agree that authorized inspectors shall have the authority to enter areas covered by such permit, at any reasonable hour, to enforce the provisions of the code.
  21. 6. I agree to comply with the above conditions, specifications and regulations of the City of Wadsworth governing this application. I understand that failure to comply may be cause for revocation of this application and issuance of a stop work order.
  22. Payment can be made by mailing a check to City of Wadsworth, Engineering Dept., 120 Maple St., Wadsworth, OH 44281 or by calling (330) 335-2751 with a credit card number. Permits will not be issued until paid in full. All applications will be reviewed prior to permit issuance.
  23. Leave This Blank:

  24. This field is not part of the form submission.