Do I need a permit to run new downspout lines?

Only if the new lines extend into the right of way (under sidewalk to street) is an Engineering Right of Way Permit required.

Show All Answers

1. Is a permit required for a shed or fence?
2. Is a permit required for my project?
3. How do I obtain a permit for a shed, fence or pool?
4. How do I obtain a permit to build a deck?
5. Do I need blue print drawings? Or what is an acceptable drawing?
6. As a general contractor do I need to be registered with the City?
7. What size of drawings need to be furnished for new home construction, planning commission and Board of Zoning Appeals?
8. Who do I make the check out to?
9. What is the mailing address of the Building and Planning Department?
10. What is an easement and why should a home owner be concerned?
11. How do I become a registered Electrical or HVAC contractor in the City?
12. What do I do if I can't download the zoning map reader?
13. Do you require a point of sale inspection?
14. Do I need a permit for a garage sale?
15. What can I do if my neighbor neglects to maintain their property?
16. Do I need a permit to pave my driveway?
17. Where do I obtain alarm registration?
18. Where do I obtain a vendor's license?
19. Do I need a permit to run new downspout lines?